Tank Cleaning, Tank Refinishing Teri-Ann Tagget Tank Cleaning, Tank Refinishing Teri-Ann Tagget

84ft Moonen Motor Yacht

Water Tank Refinshing

84ft Moonen Motor Yacht

Project Summary

Scope of Works:

  • Water Tank Refinishing

  • Vessel Protection

Project Timeframe:

  • March - April, 2020

BEFORE

BEFORE

PRIMER

PRIMER

PREP

PREP

Water Tank Refinish | After
BEFORE

BEFORE

PRIMER

PRIMER

PREP

PREP

AFTER

AFTER

BEFORE

BEFORE

PRIMER

PRIMER

BEFORE

BEFORE

PRIMER

PRIMER

BEFORE

BEFORE

PRIMER

PRIMER

PREP

PREP

AFTER

AFTER

PREP

PREP

AFTER

AFTER

PREP

PREP

AFTER

AFTER

Similar Projects:

Read More

118ft Custom Motor Yacht

Insulation Application, Tank Cleaning & Refinishing, Engine Room Bilge Cleaning

Shirley Anne 1.jpg

Project Summary

  • Lead Brick Installation

  • Engine Room Bilge Acid Wash

  • Scuppers Internal Coating

  • Forward Grey Water Tank Repairs

  • Black Grey Water Tank Refinishing

  • Potable Water Tank Refinishing

  • Tender Vessel Full Encapsulation

Scope of Works:

  • Aft Water Tank Clean

  • Engine Room Bilge Clean

  • Engine Room Clean

  • Forward Grey Water Tank Refinishing

  • Engine Room Coating Removal

  • Aft Bulkhead Insulation Application

  • Forward Bulkhead Insulation Application

  • Copper Pipes Cleaning & Coating

Project Timeframe:

  • May - November, 2019

AFT WATER TANK CLEAN [BEFORE]

AFT WATER TANK CLEAN [BEFORE]

AFT WATER TANK CLEAN [BEFORE]

AFT WATER TANK CLEAN [BEFORE]

AFT WATER TANK CLEAN [AFTER]

AFT WATER TANK CLEAN [AFTER]

AFT WATER TANK CLEAN [AFTER]

AFT WATER TANK CLEAN [AFTER]

ENGINE ROOM BILGE CLEAN [BEFORE]

ENGINE ROOM BILGE CLEAN [BEFORE]

ENGINE ROOM BILGE CLEAN [BEFORE]

ENGINE ROOM BILGE CLEAN [BEFORE]

ENGINE ROOM BILGE CLEAN [AFTER]

ENGINE ROOM BILGE CLEAN [AFTER]

ENGINE ROOM BILGE CLEAN [AFTER]

ENGINE ROOM BILGE CLEAN [AFTER]

ENGINE ROOM BILGE CLEAN [BEFORE]

ENGINE ROOM BILGE CLEAN [BEFORE]

ENGINE ROOM BILGE CLEAN [BEFORE]

ENGINE ROOM BILGE CLEAN [BEFORE]

ENGINE ROOM BILGE CLEAN [BEFORE]

ENGINE ROOM BILGE CLEAN [BEFORE]

ENGINE ROOM BILGE CLEAN [BILGE]

ENGINE ROOM BILGE CLEAN [BILGE]

ENGINE ROOM CLEAN [BEFORE]

ENGINE ROOM CLEAN [BEFORE]

ENGINE ROOM CLEAN [BEFORE]

ENGINE ROOM CLEAN [BEFORE]

ENGINE ROOM CLEAN [BEFORE]

ENGINE ROOM CLEAN [BEFORE]

ENGINE ROOM CLEAN [BEFORE]

ENGINE ROOM CLEAN [BEFORE]

ENGINE ROOM CLEAN [BEFORE]

ENGINE ROOM CLEAN [BEFORE]

FORWARD GREY WATER TANK REFINISHING [BEFORE]

FORWARD GREY WATER TANK REFINISHING [BEFORE]

FORWARD GREY WATER TANK REFINISHING [PRIMER]

FORWARD GREY WATER TANK REFINISHING [PRIMER]

FORWARD GREY WATER TANK REFINISHING [BEFORE]

FORWARD GREY WATER TANK REFINISHING [BEFORE]

FORWARD GREY WATER TANK REFINISHING [PRIMER]

FORWARD GREY WATER TANK REFINISHING [PRIMER]

ENGINE ROOM COATING REMOVAL [BEFORE]

ENGINE ROOM COATING REMOVAL [BEFORE]

AFT BULKHEAD INSULATION APPLICATION [ACID WASH & MASK]

AFT BULKHEAD INSULATION APPLICATION [ACID WASH & MASK]

AFT BULKHEAD INSULATION APPLICATION [3MM DECIDAMP 150]

AFT BULKHEAD INSULATION APPLICATION [3MM DECIDAMP 150]

AFT BULKHEAD INSULATION APPLICATION [ACID WASH & MASK]

AFT BULKHEAD INSULATION APPLICATION [ACID WASH & MASK]

AFT BULKHEAD INSULATION APPLICATION [3MM DECIDAMP 150]

AFT BULKHEAD INSULATION APPLICATION [3MM DECIDAMP 150]

LEAD BRICK INSTALLATION [DURING]

LEAD BRICK INSTALLATION [DURING]

LEAD BRICK INSTALLATION [AFTER]

LEAD BRICK INSTALLATION [AFTER]

ENGINE ROOM BILGE ACID WASH [BEFORE]

ENGINE ROOM BILGE ACID WASH [BEFORE]

ENGINE ROOM BILGE ACID WASH [BEFORE]

ENGINE ROOM BILGE ACID WASH [BEFORE]

ENGINE ROOM BILGE ACID WASH [BEFORE]

ENGINE ROOM BILGE ACID WASH [BEFORE]

SCUPPERS INTERNAL COATING [BEFORE]

SCUPPERS INTERNAL COATING [BEFORE]

SCUPPERS INTERNAL COATING [BEFORE]

SCUPPERS INTERNAL COATING [BEFORE]

FORWARD GREY WATER TANK REPAIRS [BEFORE]

FORWARD GREY WATER TANK REPAIRS [BEFORE]

BLACK GREY TANK REFINISHING [BEFORE]

BLACK GREY TANK REFINISHING [BEFORE]

BLACK GREY TANK REFINISHING [PRIMER]

BLACK GREY TANK REFINISHING [PRIMER]

TENDER VESSEL ENCAPSULATION [BEFORE]

TENDER VESSEL ENCAPSULATION [BEFORE]

ENGINE ROOM BILGE CLEAN [AFTER]

ENGINE ROOM BILGE CLEAN [AFTER]

ENGINE ROOM BILGE CLEAN [AFTER]

ENGINE ROOM BILGE CLEAN [AFTER]

ENGINE ROOM BILGE CLEAN [AFTER]

ENGINE ROOM BILGE CLEAN [AFTER]

ENGINE ROOM BILGE CLEAN [AFTER]

ENGINE ROOM BILGE CLEAN [AFTER]

ENGINE ROOM CLEAN [AFTER]

ENGINE ROOM CLEAN [AFTER]

ENGINE ROOM CLEAN [AFTER]

ENGINE ROOM CLEAN [AFTER]

ENGINE ROOM CLEAN [AFTER]

ENGINE ROOM CLEAN [AFTER]

ENGINE ROOM CLEAN [AFTER]

ENGINE ROOM CLEAN [AFTER]

ENGINE ROOM CLEAN [AFTER]

ENGINE ROOM CLEAN [AFTER]

FORWARD GREY WATER TANK REFINISHING [PREP]

FORWARD GREY WATER TANK REFINISHING [PREP]

FORWARD GREY WATER TANK REFINISHING [AFTER]

FORWARD GREY WATER TANK REFINISHING [AFTER]

FORWARD GREY WATER TANK REFINISHING [PREP]

FORWARD GREY WATER TANK REFINISHING [PREP]

FORWARD GREY WATER TANK REFINISHING [AFTER]

FORWARD GREY WATER TANK REFINISHING [AFTER]

ENGINE ROOM COATING REMOVAL [AFTER]

ENGINE ROOM COATING REMOVAL [AFTER]

AFT BULKHEAD INSULATION APPLICATION [PRIMER]

AFT BULKHEAD INSULATION APPLICATION [PRIMER]

AFT BULKHEAD INSULATION APPLICATION [AFTER]

AFT BULKHEAD INSULATION APPLICATION [AFTER]

AFT BULKHEAD INSULATION APPLICATION [PRIMER]

AFT BULKHEAD INSULATION APPLICATION [PRIMER]

AFT BULKHEAD INSULATION APPLICATION [AFTER]

AFT BULKHEAD INSULATION APPLICATION [AFTER]

LEAD BRICK INSTALLATION [DURING]

LEAD BRICK INSTALLATION [DURING]

LEAD BRICK INSTALLATION [AFTER]

LEAD BRICK INSTALLATION [AFTER]

ENGINE ROOM BILGE ACID WASH [AFTER]

ENGINE ROOM BILGE ACID WASH [AFTER]

ENGINE ROOM BILGE ACID WASH [AFTER]

ENGINE ROOM BILGE ACID WASH [AFTER]

ENGINE ROOM BILGE ACID WASH [AFTER]

ENGINE ROOM BILGE ACID WASH [AFTER]

SCUPPERS INTERNAL COATING [AFTER]

SCUPPERS INTERNAL COATING [AFTER]

SCUPPERS INTERNAL COATING [AFTER]

SCUPPERS INTERNAL COATING [AFTER]

FORWARD GREY WATER TANK REPAIRS [AFTER]

FORWARD GREY WATER TANK REPAIRS [AFTER]

BLACK GREY TANK REFINISHING [PREP]

BLACK GREY TANK REFINISHING [PREP]

BLACK GREY TANK REFINISHING [AFTER]

BLACK GREY TANK REFINISHING [AFTER]

TENDER VESSEL ENCAPSULATION [AFTER]

TENDER VESSEL ENCAPSULATION [AFTER]

Similar Projects:

Read More

86ft Luxury Motoryacht

Tank Cleaning & Refinishing, Engine Room Bilge Refinishing

86ft Luxury Motoryacht Profile Image

Project Summary

Scope of Works:

  • Port & Starboard Water Tank Clean

  • Coffer Dam Clean

  • Black & Grey Tanks Pump Out & Clean

  • Black & Grey Tanks Corrosion Removal

  • Water Tanks Refinish

  • Engine Room Bilge Refinish

Project Timeframe:

  • June - July, 2019

Black & Grey Water Tank Refinish BEFORE

Black & Grey Water Tank Refinish BEFORE

Black & Grey Water Tank Refinish PRIMER

Black & Grey Water Tank Refinish PRIMER

Black & Grey Water Tank Refinish PREP

Black & Grey Water Tank Refinish PREP

Black & Grey Water Tank Refinish AFTER

Black & Grey Water Tank Refinish AFTER

Black & Grey Water Tank Refinish BEFORE

Black & Grey Water Tank Refinish BEFORE

Black & Grey Water Tank Refinish PRIMER

Black & Grey Water Tank Refinish PRIMER

Black & Grey Water Tank Refinish BEFORE

Black & Grey Water Tank Refinish BEFORE

Black & Grey Water Tank Refinish PRIMER

Black & Grey Water Tank Refinish PRIMER

Black & Grey Water Tank Refinish PREP

Black & Grey Water Tank Refinish PREP

Black & Grey Water Tank Refinish AFTER

Black & Grey Water Tank Refinish AFTER

Black & Grey Water Tank Refinish PREP

Black & Grey Water Tank Refinish PREP

Black & Grey Water Tank Refinish AFTER

Black & Grey Water Tank Refinish AFTER

Water Tank Refinish BEFORE

Water Tank Refinish BEFORE

Water Tank Refinish PRIMER

Water Tank Refinish PRIMER

Water Tank Refinish BEFORE

Water Tank Refinish BEFORE

Water Tank Refinish PRIMER

Water Tank Refinish PRIMER

Water Tank Refinish BEFORE

Water Tank Refinish BEFORE

Water Tank Refinish PRIMER

Water Tank Refinish PRIMER

Water Tank Refinish PREP

Water Tank Refinish PREP

Water Tank Refinish AFTER

Water Tank Refinish AFTER

Water Tank Refinish PREP

Water Tank Refinish PREP

Water Tank Refinish AFTER

Water Tank Refinish AFTER

Water Tank Refinish PREP

Water Tank Refinish PREP

Water Tank Refinish AFTER

Water Tank Refinish AFTER

Similar Projects:

Read More

208ft Luxury Expedition Superyacht

Tank Cleaning & Refinishing, Vessel Encapsulation

208ft Luxury Expedition Superyacht

Project Summary

Scope of Works:

  • Helideck & Aft Deck Encapsulation

  • Diesel Tanks Port & Starboard Cleaning

  • Water & ULP Tanks Port & Starboard Cleaning

  • Vessel Pump Out

  • Parts Painting

  • Bollards Base Refinishing

  • Forward Bollards Refinishing

  • Potable Water Tank Refinishing

  • Rope Locker Refinishing

  • Engine Room Cleaning

  • Steering Flats Bilge Corrosion Refinishing

  • Tunnel Bilge Jet Wash

  • AVGAS Trailer Cleaning

Project Timeframe:

  • March - June, 2019

HELIDECK ENCAPSULATION - STRUCTURE

HELIDECK ENCAPSULATION - STRUCTURE

HELIDECK ENCAPSULATION - STRUCTURE

HELIDECK ENCAPSULATION - STRUCTURE

HELIDECK ENCAPSULATION - STRUCTURE

HELIDECK ENCAPSULATION - STRUCTURE

HELIDECK ENCAPSULATION - STRUCTURE

HELIDECK ENCAPSULATION - STRUCTURE

HELIDECK ENCAPSULATION - COMPLETED

HELIDECK ENCAPSULATION - COMPLETED

HELIDECK ENCAPSULATION - COMPLETED

HELIDECK ENCAPSULATION - COMPLETED

HELIDECK ENCAPSULATION - COMPLETED

HELIDECK ENCAPSULATION - COMPLETED

HELIDECK ENCAPSULATION - COMPLETED

HELIDECK ENCAPSULATION - COMPLETED

HELIDECK ENCAPSULATION - COMPLETED

HELIDECK ENCAPSULATION - COMPLETED

HELIDECK ENCAPSULATION - COMPLETED

HELIDECK ENCAPSULATION - COMPLETED

BALLAST TANK CLEAN - BEFORE

BALLAST TANK CLEAN - BEFORE

BALLAST TANK CLEAN - BEFORE

BALLAST TANK CLEAN - BEFORE

BALLAST TANK CLEAN - AFTER

BALLAST TANK CLEAN - AFTER

BALLAST TANK CLEAN - AFTER

BALLAST TANK CLEAN - AFTER

BALLAST TANK CLEAN - BEFORE

BALLAST TANK CLEAN - BEFORE

DIESEL TANK CLEAN - BEFORE

DIESEL TANK CLEAN - BEFORE

SHOWER BASE REFINISH - BEFORE

SHOWER BASE REFINISH - BEFORE

BOLLARDS BASE REFINISH - BEFORE

BOLLARDS BASE REFINISH - BEFORE

FORWARD BOLLARDS REFINISH - BEFORE

FORWARD BOLLARDS REFINISH - BEFORE

FORWARD BOLLARDS REFINISH - BEFORE

FORWARD BOLLARDS REFINISH - BEFORE

STEERING FLAT REFINISH - BEFORE

STEERING FLAT REFINISH - BEFORE

STEERING FLAT REFINISH - BEFORE

STEERING FLAT REFINISH - BEFORE

ROPE LOCKER REFINISH - BEFORE

ROPE LOCKER REFINISH - BEFORE

ROPE LOCKER REFINISH - BEFORE

ROPE LOCKER REFINISH - BEFORE

WATER TANK NEW STRUCTURE REFINISH - BEFORE

WATER TANK NEW STRUCTURE REFINISH - BEFORE

WATER TANK NEW STRUCTURE REFINISH - BEFORE

WATER TANK NEW STRUCTURE REFINISH - BEFORE

BALLAST TANK CLEAN - AFTER

BALLAST TANK CLEAN - AFTER

DIESEL TANK CLEAN - AFTER

DIESEL TANK CLEAN - AFTER

SHOWER BASE REFINISH - AFTER

SHOWER BASE REFINISH - AFTER

BOLLARDS BASE REFINISH - AFTER

BOLLARDS BASE REFINISH - AFTER

FORWARD BOLLARDS REFINISH - AFTER

FORWARD BOLLARDS REFINISH - AFTER

FORWARD BOLLARDS REFINISH - AFTER

FORWARD BOLLARDS REFINISH - AFTER

STEERING FLAT REFINISH - AFTER

STEERING FLAT REFINISH - AFTER

STEERING FLAT REFINISH - AFTER

STEERING FLAT REFINISH - AFTER

ROPE LOCKER REFINISH - AFTER

ROPE LOCKER REFINISH - AFTER

ROPE LOCKER REFINISH - AFTER

ROPE LOCKER REFINISH - AFTER

WATER TANK NEW STRUCTURE REFINISH - AFTER

WATER TANK NEW STRUCTURE REFINISH - AFTER

WATER TANK NEW STRUCTURE REFINISH - AFTER

WATER TANK NEW STRUCTURE REFINISH - AFTER

Similar Projects:

Read More
Tank Refinishing, Encapsulation Teri-Ann Tagget Tank Refinishing, Encapsulation Teri-Ann Tagget

168ft Damen Luxury Motoryacht

Chain Locker Repairs, Tank Refinishing & Vessel Encapsulation

This 168ft Damen Luxury Motoryacht has been a reoccurring project for Sweep Marine over the past couple of years with services ranging from chain locker repairs and tank refinishing, to painting of the port and starboard railings as well as one of biggest encapsulation projects to date.

168ft Damen Luxury Motoryacht.jpg

Project Summary

Scope of Works:

  • Water Tank Repairs & Refinish

  • Exterior Painting of Port & Starboard Railing

  • Chain Locker Repairs & Refinish

  • Painting of Deck Storage Boxes [4]

  • Worksite Encapsulation

Project Timeframe:

  • Tanks, Exterior Paint, Chain Locker: June-July 2018

  • Encapsulation: January-February 2019

Outcome:

  • Chain Locker repairs included sandblasting, priming and painting as well as rectifying issues with the existing paint which was uncovered during the preparation phase.

  • Accessing confined spaces of any area of a vessel is always a risky task which is why our staff are not only certified in confined space entry but also undertake regular training to ensure they are always completing these tasks in the most efficient and safest way possible.

  • Water Tanks were prepped, primed, and coated as per our standard refinishing process then followed up with a full clean and sanitisation ready for use.

  • It was a battle against the elements during the encapsulation of this vessel. With a full encapsulation of the Mast, top of the wheel house, mobile encapsulation of floating barge and a 3 level encapsulation of the pier, but even through the wind, rain and late nights the team pulled it off in record timing.

CHAIN LOCK REPAIRS [BEFORE]

CHAIN LOCK REPAIRS [BEFORE]

CHAIN LOCKER REPAIRS [PROTECTION]

CHAIN LOCKER REPAIRS [PROTECTION]

CHAIN LOCKER REPAIRS [BEFORE]

CHAIN LOCKER REPAIRS [BEFORE]

CHAIN LOCKER REPAIRS [BEFORE]

CHAIN LOCKER REPAIRS [BEFORE]

CHAIN LOCK REPAIRS [PREPARATION]

CHAIN LOCK REPAIRS [PREPARATION]

CHAIN LOCKER REPAIRS [AFTER]

CHAIN LOCKER REPAIRS [AFTER]

CHAIN LOCKER REPAIRS [AFTER]

CHAIN LOCKER REPAIRS [AFTER]

CHAIN LOCKER REPAIRS [AFTER]

CHAIN LOCKER REPAIRS [AFTER]

The boys did an outstanding job on this project, even when issues arose with the existing paint they still managed to get it done on time and at the highest standard possible.
— Con, Sweep Marine Director
WATER TANK REPAIRS [BEFORE]

WATER TANK REPAIRS [BEFORE]

WATER TANK REPAIRS [PRIMER]

WATER TANK REPAIRS [PRIMER]

WATER TANK REPAIRS [BEFORE]

WATER TANK REPAIRS [BEFORE]

WATER TANK REPAIRS [PREP]

WATER TANK REPAIRS [PREP]

WATER TANK REPAIRS [AFTER]

WATER TANK REPAIRS [AFTER]

WATER TANK REPAIRS [AFTER]

WATER TANK REPAIRS [AFTER]

For this vessel, Con and his crew at Sweep Marine Services skilfully enclosed all areas requiring paint repairs. Working through the night, they completed an amazing job.
— Jason, Total Refinishing
WORKSITE ENCAPSULATION

WORKSITE ENCAPSULATION

VESSEL TOWER ENCAPSULATION

VESSEL TOWER ENCAPSULATION

Similar Projects:

Read More
Tank Cleaning, Tank Refinishing Teri-Ann Tagget Tank Cleaning, Tank Refinishing Teri-Ann Tagget

147ft Luxury Expedition Yacht

Tanks Cleaning & Refinishing

New year, new projects & we definitely weren’t disappointed with this one! Kicking off 2019 with a complete refinish of the Black, Water and Grey Tanks in this 147ft Luxury Expedition Yacht.

Project Summary

Scope of Works:

  • Full clean of Black, Grey and Diesel Tanks for Survey Inspection

  • Refinish of Black Tanks, Water Tanks and Grey Tanks

Project Timeframe:

  • Completed in 14 Days - Jan 19

Outcome:

  • This project was completed within a very limited amount of time due to the vessel being on a tight deadline.

  • All works were completed while the vessel was in the water, with all equipment having to be craned onto the deck.

  • The confined space entry points were very difficult to access, creating a major challenge for the team. All tanks that needed refinishing has to be cleaned, sanded, repaired and coated through the very small access points.

STARBOARD GREY TANK CLEAN BEFORE

STARBOARD GREY TANK CLEAN BEFORE

STARBOARD GREY TANK CLEAN BEFORE

STARBOARD GREY TANK CLEAN BEFORE

STARBOARD GREY TANK CLEAN AFTER

STARBOARD GREY TANK CLEAN AFTER

STARBOARD GREY TANK CLEAN AFTER

STARBOARD GREY TANK CLEAN AFTER

STARBOARD GREY TANK CLEAN BEFORE

STARBOARD GREY TANK CLEAN BEFORE

STARBOARD GREY TANK CLEAN AFTER

STARBOARD GREY TANK CLEAN AFTER

STARBOARD WATER TANK REFINISH BEFORE

STARBOARD WATER TANK REFINISH BEFORE

STARBOARD WATER TANK REFINISH BEFORE

STARBOARD WATER TANK REFINISH BEFORE

STARBOARD WATER TANK REFINISH AFTER

STARBOARD WATER TANK REFINISH AFTER

STARBOARD WATER TANK REFINISH AFTER

STARBOARD WATER TANK REFINISH AFTER

BLACK TANK REFINISH BEFORE

BLACK TANK REFINISH BEFORE

BLACK TANK REFINISH BEFORE

BLACK TANK REFINISH BEFORE

DIESEL TANK CLEAN BEFORE

DIESEL TANK CLEAN BEFORE

BLACK TANK REFINISH AFTER

BLACK TANK REFINISH AFTER

BLACK TANK REFINISH AFTER

BLACK TANK REFINISH AFTER

DIESEL TANK CLEAN AFTER

DIESEL TANK CLEAN AFTER

Similar Projects:

Read More

79ft Racing Yacht

Black, Grey, Diesel Tanks Cleaning, Water Tank Refinishing, Bilge Anti Corrosive Coating

Project Summary

Scope of Works:

  • Black, Grey, Diesel and Water Tanks Cleaning

  • Water Tanks Corrosion Removal and Refinish

  • Full Bilge Cleaning and Anti-Corrosive Coating

Project Timeframe:

  • October - November 2017 [8 Days Total]

TANK CLEANING BEFORE

TANK CLEANING BEFORE

TANK CLEANING BEFORE

TANK CLEANING BEFORE

TANK CLEANING AFTER ACID WASH

TANK CLEANING AFTER ACID WASH

TANK CLEANING AFTER ACID WASH

TANK CLEANING AFTER ACID WASH

WATER TANK REFINISHING BEFORE

WATER TANK REFINISHING BEFORE

WATER TANK REFINISHING BEFORE

WATER TANK REFINISHING BEFORE

WATER TANK REFINISHING AFTER

WATER TANK REFINISHING AFTER

WATER TANK REFINISHING AFTER

WATER TANK REFINISHING AFTER

WATER TANK REFINISHING BEFORE

WATER TANK REFINISHING BEFORE

TANK LIDS REFINISHING BEFORE

TANK LIDS REFINISHING BEFORE

BILGE CLEAN & ANTI-CORROSIVE COATING BEFORE

BILGE CLEAN & ANTI-CORROSIVE COATING BEFORE

BILGE CLEAN & ANTI-CORROSIVE COATING BEFORE

BILGE CLEAN & ANTI-CORROSIVE COATING BEFORE

BILGE CLEAN & ANTI-CORROSIVE COATING BEFORE

BILGE CLEAN & ANTI-CORROSIVE COATING BEFORE

BILGE CLEAN & ANTI-CORROSIVE COATING BEFORE

BILGE CLEAN & ANTI-CORROSIVE COATING BEFORE

WATER TANK REFINISHING AFTER

WATER TANK REFINISHING AFTER

TANK LIDS REFINISHING AFTER

TANK LIDS REFINISHING AFTER

BILGE CLEAN & ANTI-CORROSIVE COATING AFTER

BILGE CLEAN & ANTI-CORROSIVE COATING AFTER

BILGE CLEAN & ANTI-CORROSIVE COATING AFTER

BILGE CLEAN & ANTI-CORROSIVE COATING AFTER

BILGE CLEAN & ANTI-CORROSIVE COATING AFTER

BILGE CLEAN & ANTI-CORROSIVE COATING AFTER

BILGE CLEAN & ANTI-CORROSIVE COATING AFTER

BILGE CLEAN & ANTI-CORROSIVE COATING AFTER

Similar Projects:

Read More
Tank Refinishing, Machinery Space Cleaning Teri-Ann Tagget Tank Refinishing, Machinery Space Cleaning Teri-Ann Tagget

121ft Sunseeker Motoryacht

Tank Refinishing, Machinery & Parts Refinishing

121ft Sunseeker Motoryacht

Project Summary

Scope of Works:

  • New Exhaust Mixers Painting

  • Pipework, Machinery & Tanks Refinishing

  • Deck vents & Grills Refinishing

  • Mast Domes Refinishing

  • Existing Hull Penetrations Repairs & Refinishing

Project Timeframe:

  • July, 2015

  • June - July, 2018

EXHAUST PARTS REFINISH BEFORE

EXHAUST PARTS REFINISH BEFORE

EXHAUST PARTS REFINISH BEFORE

EXHAUST PARTS REFINISH BEFORE

EXHAUST PARTS REFINISH AFTER

EXHAUST PARTS REFINISH AFTER

EXHAUST PARTS REFINISH AFTER

EXHAUST PARTS REFINISH AFTER

EXHAUST PARTS REFINISH BEFORE

EXHAUST PARTS REFINISH BEFORE

EXHAUST PARTS REFINISH BEFORE

EXHAUST PARTS REFINISH BEFORE

EXHAUST PARTS REFINISH AFTER

EXHAUST PARTS REFINISH AFTER

EXHAUST PARTS REFINISH AFTER

EXHAUST PARTS REFINISH AFTER

EXHAUST PARTS REFINISH BEFORE

EXHAUST PARTS REFINISH BEFORE

MAST DOMES REFINISH BEFORE

MAST DOMES REFINISH BEFORE

MAST DOMES REFINISH BEFORE

MAST DOMES REFINISH BEFORE

EXHAUST PARTS REFINISH AFTER

EXHAUST PARTS REFINISH AFTER

MAST DOMES REFINISH AFTER

MAST DOMES REFINISH AFTER

MAST DOMES REFINISH AFTER

MAST DOMES REFINISH AFTER

Similar Projects:

Read More

105ft Lloyds Motoryacht

Black, Grey & Water Tank Refinishing, Diesel Tank & Voids Cleaning

105ft+Lloyds+Motoryacht

Project Summary

Scope of Works:

  • Full Voids Clean for Survey Inspection

  • Black & Grey Tanks Refinshing

  • Aft Diesel Tank Cleaning

  • Water Tanks Refinishing

Project Timeframe:

  • July - November, 2017

  • May, 2018

VOIDS CLEANING FOR SURVEY BEFORE

VOIDS CLEANING FOR SURVEY BEFORE

VOIDS CLEANING FOR SURVEY BEFORE

VOIDS CLEANING FOR SURVEY BEFORE

VOIDS CLEANING FOR SURVEY AFTER

VOIDS CLEANING FOR SURVEY AFTER

VOIDS CLEANING FOR SURVEY AFTER

VOIDS CLEANING FOR SURVEY AFTER

VOIDS CLEANING FOR SURVEY BEFORE

VOIDS CLEANING FOR SURVEY BEFORE

PORT DIESEL TANK CLEANING BEFORE

PORT DIESEL TANK CLEANING BEFORE

VOIDS CLEANING FOR SURVEY AFTER

VOIDS CLEANING FOR SURVEY AFTER

PORT DIESEL TANK CLEANING AFTER

PORT DIESEL TANK CLEANING AFTER

PORT DIESEL TANK CLEANING BEFORE

PORT DIESEL TANK CLEANING BEFORE

AFT DIESEL TANK CLEAN BEFORE

AFT DIESEL TANK CLEAN BEFORE

AFT DIESEL TANK CLEAN BEFORE

AFT DIESEL TANK CLEAN BEFORE

AFT DIESEL TANK CLEAN BEFORE

AFT DIESEL TANK CLEAN BEFORE

TANK REFINISHING BEFORE

TANK REFINISHING BEFORE

TANK REFINISHING BEFORE

TANK REFINISHING BEFORE

TANK REFINISHING BEFORE

TANK REFINISHING BEFORE

TANK REFINISHING BEFORE

TANK REFINISHING BEFORE

PORT DIESEL TANK CLEANING AFTER

PORT DIESEL TANK CLEANING AFTER

AFT DIESEL TANK CLEAN AFTER

AFT DIESEL TANK CLEAN AFTER

AFT DIESEL TANK CLEAN AFTER

AFT DIESEL TANK CLEAN AFTER

AFT DIESEL TANK CLEAN AFTER

AFT DIESEL TANK CLEAN AFTER

TANK REFINISHING AFTER

TANK REFINISHING AFTER

TANK REFINISHING AFTER

TANK REFINISHING AFTER

TANK REFINISHING AFTER

TANK REFINISHING AFTER

TANK REFINISHING AFTER

TANK REFINISHING AFTER

Similar Projects:

Read More

80ft Kumeu Sailing Yacht

Bilge Refinishing, Tanks Cleaning, Parts Repairs & Refinishing

Project Summary

Scope of Works:

  • Full Bilge Refinishing

  • Black, Grey, Water and Diesel Tanks Cleaning

  • Water Tanks Refinishing

  • Chain Plates Rust Repairs and Refinishing

Project Timeframe:

  • July - October 2017

BILGE REFINISH BEFORE

BILGE REFINISH BEFORE

BILGE REFINISH PREPARATION

BILGE REFINISH PREPARATION

BILGE REFINISH PRIMER

BILGE REFINISH PRIMER

BILGE REFINISH AFTER

BILGE REFINISH AFTER

BILGE REFINISH BEFORE

BILGE REFINISH BEFORE

BILGE REFINISH BEFORE

BILGE REFINISH BEFORE

BILGE REFINISH AFTER

BILGE REFINISH AFTER

BILGE REFINISH AFTER

BILGE REFINISH AFTER

BILGE REFINISH BEFORE

BILGE REFINISH BEFORE

BILGE REFINISH BEFORE

BILGE REFINISH BEFORE

CHAIN LOCKER CLEAN BEFORE

CHAIN LOCKER CLEAN BEFORE

CHAIN LOCK CLEAN BEFORE

CHAIN LOCK CLEAN BEFORE

CHAIN LOCKER CLEAN BEFORE

CHAIN LOCKER CLEAN BEFORE

WATER TANK REFINISH BEFORE

WATER TANK REFINISH BEFORE

WATER TANK REFINISH BEFORE

WATER TANK REFINISH BEFORE

WATER TANK REFINISH BEFORE

WATER TANK REFINISH BEFORE

BILGE REFINISH AFTER

BILGE REFINISH AFTER

BILGE REFINISH AFTER

BILGE REFINISH AFTER

CHAIN LOCKER CLEAN AFTER

CHAIN LOCKER CLEAN AFTER

CHAIN LOCKER CLEAN AFTER

CHAIN LOCKER CLEAN AFTER

CHAIN LOCKER CLEAN AFTER

CHAIN LOCKER CLEAN AFTER

WATER TANK REFINISH AFTER

WATER TANK REFINISH AFTER

WATER TANK REFINISH AFTER

WATER TANK REFINISH AFTER

WATER TANK REFINISH AFTER

WATER TANK REFINISH AFTER

Similar Projects:

Read More